How to splice a plant-level satellite index onto the Fed's IP series

Row of parked semi trucks in a rainy lot, shown in black and white.

The Fed's G.17 release tells you what industrial production did last month, revised, seasonally adjusted, and about three to five weeks stale by the time it hits your terminal. Running a sector view off a weekly plant-level series built from vehicle counts or thermal reads at the sites that matter to your thesis comes down to one practical test: can you splice that series onto the official one cleanly enough to trust the gap months.

Here's the mechanics of doing that without fooling yourself.

Growth rates, not levels

Don't try to match your satellite index's level to the IP index's level. They're built from completely different bases: IP is a Laspeyres-type weighted composite of output across hundreds of subsectors, rebased periodically; your plant series is a count of trucks, plumes, and thermal signal at however many sites you're tracking. The levels have no reason to agree and chasing that agreement will just give you a spurious scaling constant that breaks the next time either series gets revised.

Work in growth rates instead. Take the weekly series, aggregate it to monthly (simple average of the weeks in the month, or weighted if coverage cadence is uneven), and compute month-over-month or year-over-year percent changes. Compute the same for the Fed series over the overlap period. Regress one on the other, or just eyeball the correlation if the sample is short. If the two growth series track, chain-link them: take the last official IP print as the base level, then roll it forward using the satellite series' growth rate for every month after that print, until the next official release lands and the series resets to the new official base.

That reset step matters: the spliced series bridges the window between prints and snaps back to the benchmark the moment the next one arrives, the same logic BEA uses when chain-weighting between annual rebases.

Picking your overlap window and backfilling the series

You need enough history where both series exist side by side to know if the relationship holds, and to see if it holds the same way across a cycle. A six-month overlap during a quiet stretch of the economy will look great and tell you nothing about how the plant series behaves during a demand shock or a planned turnaround. Pull as much backfill as your satellite vendor's archive supports, ideally spanning at least one meaningful swing in capacity utilization, and check the correlation separately in the expansion and contraction segments. A series that tracks IP growth in steady months but diverges hard during a downturn is telling you something real about what it's measuring, usually that plant-level visible activity (trucks, plumes) lags or leads actual throughput differently depending on whether a facility is ramping or idling.

Also check for site-composition drift. If your satellite index covers twenty plants and your sector exposure is really about forty, your spliced series is tracking a subsample, not the sector. Rolling in more sites over time without re-running the backfill will make growth rates jump for reasons that have nothing to do with output. Keep a fixed panel for the backfill and overlap test, then treat any site additions as a new series that needs its own overlap check before you fold it in.

One more thing worth flagging on the data side: a plant-level series like the one behind a weekly industrial activity index built from plant-level satellite reads only has as much signal as its site list matches your actual sector weighting, so the splice is only as good as the panel underneath it.

Once the growth-rate correlation holds up across a cycle and the panel composition is stable, the splice gives you a defensible bridge estimate for the current month and the one before it, both of which the Fed hasn't told you about yet. Industrial Index builds that weekly plant-level series if you want a starting panel to test the method on.

Start a pilot

Back to the blog